Case studies

Specialist Malt Kiln for Peated Whiskey

Don Valley Engineering won a competitive tender to supply a specialist kiln for producing peated malt for the production of malt whisky. The company’s significant knowledge of this type of equipment meant the client would get a functional & robust plant suitable for the severe operating conditions created by the peat smoke.

ARM Project

The Breedon Cement Alternative Raw Materials (ARM) Project

Don Valley Engineering partnered with Breedon Cement to deliver a materials handling solution for their Alternative Raw Materials (ARM) Project at Hope, Derbyshire. This initiative reduces their carbon footprint by increasing the use of recycled materials into cement production, Our team overcame complex site constraints to design and install a system that blends sustainability with efficiency.

Gebr Pfeiffer Mill – DSG Plant Conversion

Full design, fabrication, delivery and installation of a new milling and calcining system. The upgraded system is capable of processing natural gypsum, desulphogypsum (DSG), and reclaimed materials, integrating seamlessly with existing plant infrastructure to enhance production efficiency and material handling capabilities

Thomas Fawcetts Invest in Heat Recovery on their Kiln

Thomas Fawcett & Sons are a family owned malting company in West Yorkshire with a long history of supplying high quality malts to traditional and craft
brewers. They have a mix of traditional floor maltings and modern plant.

The project brief was to improve efficiency of their largest kiln, cutting fuel use and reducing their carbon emissions.

Atex & Dsear Compliant Grain Handling & Storage System

As part of a large scale project, Don Valley Engineering supported the main contractor with the design, supply and installation of a full grain intake and conveying plant complete with 420 tonne storage capacity, sampling, dressing and process weighing facilities and ATEX compliant dust extraction system for the world renowned Macallan Single Malt

Complete Maltings Upgrade & Plant Modernisation

As the main contractor, Don Valley Engineering embraced the responsibility of a major, multi-million pound maltings plant refurbishment project providing the latest process knowledge & design to the client. As Principal Contractor, Don Valley Engineering successfully managed the site operations of its 30+ strong team & various subcontractors.